Products: Stainless steel pipe
Project location: Africa
Standard and material:ASTM A312 316L
Purpose: Water transmission
Inquiry time:2022.03.01
Order time:2022.03.07
Shipping time:2022.3.14
Arrival time:2022.3.21
Xinyue has decades of project supply experience, so it is crucial to have a deep understanding of the urgency of the project construction time and the timeliness of the arrival of goods. In order to meet the urgent arrival needs of some projects, Xinyue developed a mature air transportation service system, which can meet the needs of timely delivery and rapid arrival.
At the beginning of March 2022, Xinyue received a small amount of stainless steel demand from African customers, but the delivery time was very special, and the goods needed to reach the destination within 25 days. After comprehensive consideration, Xinyue recommended air transportation to customers, and quickly locked it in. The last few flights.
Air freight has very strict requirements on the length of the goods and the size of the packaging. First of all, the length of the goods cannot exceed 3 meters. The packaging needs to be a number of wooden boxes and adjusted according to the size of the cabin. With the efforts of Xinyue Logistics Department and Production Department, we finally completed the delivery, wooden box customization, and delivery within 7 days of the customer’s order, and finally the customer received the goods within 20 days.
After the goods arrived at the construction site, the customer carried out a strict inspection and finally confirmed that the goods were in good condition and highly praised the quality and service of our goods.
Written by Lisa