
Project Location :Chile
Product:ASTM A694 F65 WNRF Flange
Specification:28 inch & 32 inch
Application:Pipeline Repair
During the 2026 Mid-Autumn Festival break, we received a urgent purchase request from our Chilean client. The client’s on-site pipeline repair was time-critical and required ASTM A694 F65 WNRF flanges with a short lead time.
Upon receipt of the request, we promptly reviewed production scheduling, finalized costing and shared our proposal. The client confirmed the PO and remitted full payment upfront; the PI would follow subsequently. Our goal was to seize this narrow window and start production prior to the National Day holiday.
Once payment was confirmed, our procurement, technical and production teams aligned quickly to lock inspection requirements and schedule priority production.
After the National Day holiday, the QC team carried out full inspection and sample testing. Dimensional check, chemical composition and mechanical property tests all met ASTM requirements. The qualified goods were properly packed and delivered to the port as agreed. The client was satisfied with our execution.
The cargo is expected to arrive in end of November 2026 for the local pipeline repair.
Client trust is reflected in every urgent order. Beyond supplying qualified pipe fittings, our strength lies in handling tight schedules and keeping delivery promises. From holiday coordination and priority production to full testing and timely loading, every step serves the commitment we make. We will keep supporting global partners with reliable products and responsive service.
Written by Xinyue Steel Team
Contact Xinyue Steel NOW:
Email: sales@xysteelpipe.com
WhatsApp: 086 189 7484 9825