Project location:Qatar Product:ERW Welded Steel Pipe Galvanized Steel Pipe Standard and material:ASTM A53 GrB Specifications: 273*9.27*5.8 323.10.31*5.8 355.6*11.13*5.8 406.4*12.7*5.8 273.1*9.27*5.8 Usage: Stock Inquiry time:2022.06 Order time:2022.07 Shipping time:2022.11 Arrival time:2023.01 This order is an inventory order of an old customer in Qatar. The customer is a local stocker and also participates in the supply of products for oil projects….
Read MoreProject location:Qatar Product:LSAW Welded Steel Pipe Standard and material:ASTM A53 GrB Specifications:660*9.53*12000mm 813*9.53*12000mm 660*9.53*6000mm 813*9.53*6000mm Usage: Construction project Inquiry time:2022.08.06 Order time:2022.08.15 Shipping time:2022.10.26 Arrival time:2022.12.08 This order is the project of the Qatar customer. The customer purchased a batch of steel pipes in stock from our company in June this year, which was highly praised by the customer…
Read MoreProject Location: Indonesia Product:SEAMLESS STEEL PIPE Specification:Outer Diameter: 60.3MM—168.3MM Length: 5.8M Standard and Material:ASTM A53 GR B Usage: manufacture conveyor rollers Inquiry Time:2022.07.28 Order Time:2022.09.28 Shipping Time:2022.11.10 This is about a seamless steel pipes order from new customer in Indonesia. At the beginning of the inquiry, the customer were not very interested in us and were very cautious about…
Read MoreProject location:Middle East Product:Spools (Short pipes&fittings welded with double flanges) Specifications:OD 114-813MM, WT 6-17MM, L 800-4200MM Standard and material:Pipes in ASTM A53 GRB; Fittings in B16.9 ASTM A234 WPB; Flanges in EN1092-1 ASTM A105; Welded in standard API 1104 Hydro test in EN13480-5 Usage:Pressure Liquid Pipeline project Inquiry time:2022.03.02 Order time:2022.07.20 Shipping time:2022.09.22 Estimated arrival time:2022.10.28 This order is…
Read MoreProject Location: Mongolia Product:ERW&SSAW PIPES, FITTINGS, FLANGES, BOLTS&NUTS,GASKETS PIPES WITH FBE COATING Specification:Outer Diameter: 219MM—1626MM Length: 6M–12M Standard and Material:ASTM A53 GR B, API 5L PSL1 GR B Usage: Water Purification Plant Construction Inquiry Time:02.2022 Order Time:08.2022 Shipping Time:11.2022 This is a Mongolian drinking water purification plant construction project that has been followed up from earlier month this year….
Read MoreERW welded pipe is formed by using the skin effect and proximity effect of high-frequency current to rapidly heat the edge of the formed pipe blank to the welding temperature and then extrude and weld it. According to the different feeding methods, ERW welded pipes can be divided into high frequency contact welding and high frequency induction welding. Both…
Read MoreProject location:CHILE Product:ERW STEEL PIPE Standard and material:ASTM A53 GR A Specifications:18”STD Usage:Low liquid transmission pipeline Inquiry time:2022.05.10 Order time:2022.08.05 Shipping time:2022.09.05 Estimated arrival time:2022.10.20 This order is a Chile regular client regular order every year. This client has long time cooperation relationship with Xinyue for many years. Xinyue providing superior quality, fast delivery time and excellent service so…
Read MoreProject location:Middle East Product:Spool(Short pipes&fittings welded with double flanges) Specifications:OD 114-813MM, WT 6-17MM, L 800-4200MM Standard and material:Pipes in ASTM A53 GRB; Fittings in B16.9 ASTM A234 WPB; Flanges in EN1092-1 ASTM A105; Welded in standard API 1104 Testing in EN13480-5 Usage:Liquid Pressure Pipeline project Inquiry time:2022.03.02 Order time:2022.07.20 Shipping time:2022.09.08 Estimated arrival time:2022.10.5 This order is still from…
Read MoreXINYUE STEEL GROUP set up several production bases in Tianjin & Hebei Province, manufacturing ERW Steel Pipe, SSAW Steel Pipe, LSAW Steel Pipe, Seamless Steel Pipe, Scaffolding system and couplers, RHS, SHS, etc.