Project Location: Vietnam Product: ERW Steel Pipe Standard Material: AS 1163 C250 / C350 Specifications:27mm-219mm Application: Steel Fabrication Inquiry Date:2022.9.26 Order Date:2022.09.30 Delivery Date:2022.11.4 Arrival Date:2022.11.20 Xinyue has been cultivating on the world steel pipe market for many years and has strong ability to develop new customers. At the same time, with stable quality assurance and professional services, we…
Read MoreProject location:Philippine Product:ERW & LSAW Pipe Standard and material:ASTM A572 GRADE50/ Q355B Specifications:OD219X8.2MM – OD660X 25MM Usage:Steel structure Inquiry time:2022, 6.15 Order time: 2022 , 10.26 Shipping time:2022. 11.30 Estimated arrival time:2022.12.15 This order came from a local contractor in the Philippines. At the beginning of June 2022, the customer sent inquiry to Xinyue. Through communication, We learned that…
Read MoreCarbon steel tubes are made of steel castings or solid round steel through holes to make capillaries, and then made by hot rolling, cold rolling or cold drawing. Carbon steel tubes have an important position in China’s seamless steel tube industry. The key materials are mainly q235, 20#, 35#, 45#, and 16mn. The most important product implementation standards include…
Read MoreProject location:Manila, Philippine Product:Scaffolding tube & coupler Standard and material:BS1139 Specifications:DN40*SCH STD*6M Usage:Scaffolding Inquiry time:2022.09.20 Order time:2022.09.28 Shipping time:2022.10.25 Estimated arrival time:2022.11 On September 28, 2022, Tianjin Xinyue received an inquiry from an old customer about scaffolding. The scaffolding steel pipes and fasteners of a cabinet were used as a supplement to the materials for the project under construction….
Read MoreProject location:Vietnam Product:Hot Dipped Galvanized Pipe and Fittings Standard and material: ASTM A320 GR.B, ASTM A312 TP304 Specifications:1” to 12” Usage:construction project Inquiry time:2022.09.02 Order time:2022.09.16 Shipping time:2022.10.08 Estimated arrival time:2022.10.23 At the beginning of September, Xinyue received inquiries for galvanized pipe and pipe fittings projects from old customers in Vietnam. The number of inquiries was small and the…
Read MoreProject Location: Libya Products: seamless steel pipe Size: 323.9*9.53MM; Standard: API 5L PSL2 GR BN Application:Oil pipeline Inquiry time:29th Apr, 2021 Purchase time: 12nd Oct, 2022 Estimated Shipping time: 23rd Dec, 2022 Estimated Arrival time: January, 2023 The end user of this project is the Libyan Petroleum Company, which cooperated with the customer for a large straight seam project…
Read MoreThe galvanizing method of seamless pipe (SMLS) shall be hot-dip galvanizing. Size, shape, surface, mechanical properties and process performance inspection should be carried out before galvanizing. Surface quality requirements of galvanized layer: The galvanized layer on the inner and outer surfaces of the seamless steel pipe should be complete, no black spots and air bubbles without zinc plating are…
Read MoreIn the casting and rolling process of seamless steel pipe, one of the important technical indicators to measure the processing quality of seamless steel pipe is straightness. Most seamless pipes need to be straightened, and the oblique roller straightening has high work efficiency and is in the main position. However, for the bending deformation of steel pipe ends and…
Read MoreXINYUE STEEL GROUP set up several production bases in Tianjin & Hebei Province, manufacturing ERW Steel Pipe, SSAW Steel Pipe, LSAW Steel Pipe, Seamless Steel Pipe, Scaffolding system and couplers, RHS, SHS, etc.