Xinyue Steel Pipe Support mine construction

Case 1

Project location:Indonesia

Usage:Copper mine construction

Product: Seamless Tube & Steel Plate

Standard and material:S355J2H & ASTM A572 GR.50

Specifications:

PLATE 100×1780×8500

PIPE 350A(14”)×17.4×6000

PIPE 450A(18”)×12.5×6000

Arrival time:2024.1

Case 2

Product: ERW Steel Pipe

Standard and material:ASTM A53 GR.B

Specifications:

PIPE 250A (10″) SCH40×6000 (273×9.27×6000)

PIPE 300A (12″) ×9.53×6000 (323.8×9.53×6000)

PIPE 300A (12″) ×12.5×6000 (323.9×12.5×6000)

Arrival time:2024.2

Excellent service and quality are always the reasons why customers firmly choose Xinyue. In recent years, many well-known international companies have reached long-term cooperation with Xinyue. The customer introduced to you this time is a top processing manufacturer from Indonesia. It has placed more than ten orders with Xinyue. The steel purchased by the customer is used in his copper mine construction project. Terminal is Indonesia’s second largest gold and copper mining company. The customer was very satisfied after receiving the first batch of products and immediately ordered the second batch. The two batches of products included ultra-thick steel plates, low-temperature steel pipes and welded steel pipes. Copper mine construction has high requirements for products and technology, which is also the reason why customers firmly choose Xinyue. Xinyue strictly controls quality during production and actively cooperates with third-party inspections. No matter whether the product is special or not, Xinyue will take it seriously and strive to achieve “Xinyue Selection”!

Written by Amy