Proyecto de estructuras marinas de Honduras Bulk Handling Dock Marine

Project Name: Proyecto de estructuras marinas de Honduras Bulk Handling Dock Marine

 

Producto: Tubería de acero SSAW

Grado estándar y de acero: ASTM A252 Grade 3

Cantidad: 1429.8 montones

Project Overview:

This project is the construction structure of the Honduras terminal. The customer is a

direct terminal and is purchased through an intermediate contractor. The pipe is a 40-

meter long pipe with a total of 1400 montones. This project middlemen have branches in the

world, and the managers of the Chinese branch are responsible for the final inspection

and confirmation of the supplier. After two months of negotiation , the customer finally

selected our company and sent professional engineers to the factory to start

manufacture supervision of the whole process. After the supervision passed, this order

was finally shipped smoothly.

Especificación: