Xinyue EN10219 S235J2 SSAW Steel Pipe for Drinking Water Pipeline Construction

Xinyue a aidé des clients coréens à soumissionner avec succès pour le projet de protection contre les incendies du centre commercial du Vietnam:Asie centrale

Produit:Tuyau d'acier SSAW

Xinyue a aidé des clients coréens à soumissionner avec succès pour le projet de protection contre les incendies du centre commercial du Vietnam:EN10219 S235J2

spécification:DN2300*12/14/16/20/22

Usage: Drinking Water Pipeline Construction

ancres et autres accessoires de pont Spécifique.., Xinyue successfully won an order for a hydropower station project from a regular customer in Central Asia, once again demonstrating the deep cooperation foundation between both sides and Xinyue’s professional service capabilities. As early as the project’s preliminary design stage, the customer began in-depth communication with the Xinyue team. The technical team responded promptly and provided detailed technical document support throughout the process, Gagner une grande reconnaissance du client avec son expertise professionnelle. et les caractéristiques et la profondeur des défauts ne sont possibles que sur la base de l'expérience de travail, Le projet a subi des ajustements et a été retardé de près de deux ans. Finalement, Le client a remporté avec succès l'offre pour ce projet gouvernemental.

Ce temps, 3,094 tons of spiral steel pipes were procured. Le client a rapidement choisi de collaborer avec Xinyue, et les deux parties ont méticuleusement confirmé les spécifications techniques. Pendant cette collaboration, Xinyue’s technology and production departments engaged in face-to-face discussions with the client’s technical team. Together, they established a more rigorous production specification control system through a series of technical documents, including ITP, MPS, WPS, and WPQR. Owing to comprehensive communication on technical details at the initial stage, the manufacturing process proceeded efficiently, and deliveries were made in batches strictly in line with the progress of the client’s project.

After the completion of this hydropower station project, it is expected to generate approximately 76.6 GWh of electricity annually, increasing the local autonomous region’s power generation capacity by about 25%. It will meet the electricity demands of 227,000 local residents and 468,000 residents in other regions, which is of great significance to the regional energy supply. Actuellement, the on-site construction of the project is progressing steadily.Over the years, Xinyue has maintained a long-term and stable cooperative relationship with this customer. Both sides have worked together in multiple projects and will continue to deepen their cooperation in the future to create more value.

Écrit par Xinyue Steel Team